
ADU Builder in West Gardiner, ME
Standalone and garage-integrated accessory dwelling units, full systems, sized to fit West Gardiner's larger highway-corridor lots.

An ADU in West Gardiner is a full accessory dwelling unit: a smaller, self-contained home with its own kitchen, bath, and systems, built either as a standalone building or worked into a garage. The larger rural lots along the I-95 corridor here usually give us more room to place one than you get in tighter towns.
We check West Gardiner's zoning rules before any design work starts, so you know what fits your lot up front. The same crew handles the whole job, whether it's a standalone unit or one tied into a garage.
The owner walks your property in person before design or demo begins. That's when you get a straight read on what will work, plus honest numbers on cost and timeline.
About our West Gardiner work
- Owner walks every site personally before design
- I-95 corridor and rural-lot ADU experience
- Kennebec County focused
ADU builder work in West Gardiner
ME usually has more room to work with than most towns, given the larger rural lots common along the I-95 corridor here.
- Local zoning confirmed before design work starts
- Larger-lot, rural-corridor ADU experience
- Same crew for standalone or garage-integrated builds
- 6Years building across Central Maine
- 30+Homes built, start to finish
- 1Owner who walks every job
Client Testimonials
What homeowners say
Did a great job expanding my one car garage to a two car garage. They did exactly what I wanted, and then some.
Overall, the experience was overwhelmingly positive, marked by consistently excellent communication.
Went above and beyond from start to finish.
Get your free estimate request sent in 60 seconds
Answer a few quick questions about your West Gardiner project. No pressure, no obligation, just a straight answer on cost and timeline.
Other services we offer in West Gardiner
Areas we serve
Nearby areas we serve
Find the shop
Directions from West Gardiner, ME to our shop in Augusta
219 Capitol St. Ste. 8Augusta, ME 04330

Site work and foundation for a West Gardiner ADU
Foundation, framing, and full residential systems, plumbing, electrical, and HVAC, planned around your West Gardiner property's larger lot and easy delivery access off I-95.

Standalone vs. garage-integrated in West Gardiner
Standalone units fit West Gardiner's larger rural lots well, with room to site the unit for privacy. Garage-integrated ADUs are still an option if you'd rather keep the footprint compact.

Finish work and full systems
Full kitchen or kitchenette, bath, and finish work sized to the actual use. On the bigger rural lots off Exit 102 people usually want family space or a home office.
3 step process
How it works
Get your free estimate.
We walk the site and confirm what West Gardiner zoning allows before anything else.
We design and build it.
Foundation through final finish, one crew start to finish.
Final walkthrough.
You go through the unit before we close the job.
Worth knowing
ADU builder in West Gardiner, ME
West Gardiner sits along the I-95 Exit 102 corridor, and its larger rural lots plus easy equipment and delivery access make it a common spot for bigger builds. That same flexibility applies to ADUs, giving most properties here more siting options than tighter-lot towns nearby.
ADU zoning rules vary town by town in Maine and change more often than most other permitting categories, so we always confirm current West Gardiner rules rather than assuming a blanket standard.

Plan on 2 to 4 months minimum before groundbreaking, given the permitting and full residential-systems scope involved. Larger rural lots can still have well and septic considerations worth confirming early.
Town of West Gardiner Code Enforcement requires a standard building permit for any new ADU structure.
Maine does not license general contractors or builders, so ask to see photos of past ADU projects specifically, and ask whether a contractor has experience siting larger builds on rural, highway-corridor lots.
What it costs
How much an ADU costs in West Gardiner
The figures below are ranges, not quotes.
| Scope tier | What's included | Estimated range* |
|---|---|---|
| Small garage-integrated ADU | Kitchenette, bath, up to 400 sq ft | $60,000 to $110,000 |
| Standalone ADU, kitchenette | Full systems, up to 600 sq ft | $110,000 to $180,000 |
| Standalone ADU, full kitchen | Full systems, 600 to 900 sq ft | $180,000 to $280,000+ |
New well or septic capacity work on a rural West Gardiner parcel can add to the range above.
Does my West Gardiner property allow an ADU?
West Gardiner Code Enforcement handles permits for new structures, and we confirm the current requirements before we design anything.
Do I need new septic capacity for an ADU in West Gardiner?
It depends on your existing system's capacity, which is a common gating factor on rural lots. We check this early.
Is a larger standalone ADU realistic on my West Gardiner lot?
Often, yes. The town's larger rural lots give more flexibility than tighter-lot towns nearby. We confirm during the site walk.
How long does an ADU build take in West Gardiner?
Plan on 2 to 4 months minimum before groundbreaking for permitting, then construction time depending on scope.

Next step
Ready to talk about your West Gardiner ADU
Get in touch. We'll walk the site and tell you straight what is possible and what it runs.






