ADU Builder in Farmingdale, ME
Standalone and garage-integrated accessory dwelling units, full systems, permitted right on Farmingdale's sloped Kennebec-valley lots.

An ADU in Farmingdale, ME is a small, self-contained living space on your property: its own kitchen, bath, and utilities. We build them two ways here, either standalone or worked into a garage, with the same crew handling both.
Most Farmingdale lots slope toward the Kennebec, so the real first step is grading and drainage. We plan how water moves off the site before we settle on where the ADU sits.
The owner walks every site in person before any design or demo starts, and we confirm the town's zoning up front so you know what fits. From there you get a straight answer on cost and timeline.
About our Farmingdale work
- Owner walks every site personally before design
- Narrow river-valley ADU experience
- Kennebec County focused
ADU builder work in Farmingdale
ME often means grading and drainage planning first, since a lot of lots here slope toward the river.
- Local zoning confirmed before design work starts
- Slope and drainage planning for river-facing lots
- Same crew for standalone or garage-integrated builds
- 6Years building across Central Maine
- 30+Homes built, start to finish
- 1Owner who walks every job
Client Testimonials
What homeowners say
Did an amazing job on our new bathroom remodel.
Very quick, efficient, and enjoyable to work with. Everyone was so friendly, and I was so pleased with the way it came out.
Went above and beyond from start to finish.
Get your free estimate request sent in 60 seconds
Answer a few quick questions about your Farmingdale project. No pressure, no obligation, just a straight answer on cost and timeline.
Other services we offer in Farmingdale
Areas we serve
Nearby areas we serve
Find the shop
Directions from Farmingdale, ME to our shop in Augusta
219 Capitol St. Ste. 8Augusta, ME 04330

Site work and foundation for a Farmingdale ADU
Foundation, framing, and full residential systems, plumbing, electrical, and HVAC, planned around your Farmingdale lot's slope and drainage.

Standalone vs. garage-integrated in Farmingdale
Standalone units need drainage worked out on sloped lots facing the Kennebec. Garage-integrated ADUs can simplify site work where slope is a bigger constraint.

Finish work and full systems
Full kitchen or kitchenette, bath, and finish work sized to the actual use. Close to the Route 201 corridor a rental unit is the common ask.
3 step process
How it works
Get your free estimate.
We walk the site and confirm what Farmingdale zoning allows before anything else.
Design turns into construction.
One crew runs it through to final finish.
Walkthrough.
You check the unit first, we call it done second.
Worth knowing
ADU builder in Farmingdale, ME
Farmingdale is a narrow river-valley town squeezed between Augusta and Gardiner along the Kennebec, and many lots here slope toward the water. That slope is one of the first things we assess when siting an ADU, since drainage and grading decisions have to happen before foundation work.
ADU zoning rules vary town by town in Maine and change more often than most other permitting categories, so we always confirm current Farmingdale rules rather than assuming a blanket standard. Any new construction, addition, or accessory structure needs a Town of Farmingdale building permit.

Plan on 2 to 4 months minimum before groundbreaking, given the permitting and full residential-systems scope involved. Starting the zoning and drainage conversation early avoids delays later.
Town of Farmingdale Code Enforcement requires a permit for new construction, additions, and accessory structures. Sloped lots also need drainage addressed so water doesn't undermine the new foundation.
Maine does not license general contractors or builders, so ask to see photos of past ADU projects specifically, and ask whether a contractor has handled drainage planning on a sloped river-valley lot before.
What it costs
How much an ADU costs in Farmingdale
These are ranges. Your quote comes after we walk the property.
| Scope tier | What's included | Estimated range* |
|---|---|---|
| Small garage-integrated ADU | Kitchenette, bath, up to 400 sq ft | $60,000 to $110,000 |
| Standalone ADU, kitchenette | Full systems, up to 600 sq ft | $110,000 to $180,000 |
| Standalone ADU, full kitchen | Full systems, 600 to 900 sq ft | $180,000 to $280,000+ |
Sloped, water-facing lots can add drainage and grading work versus flatter Farmingdale properties.
Does my Farmingdale property allow an ADU?
Farmingdale's Code Enforcement Officer requires a permit for accessory structures, and we confirm the current rules there before we design anything.
Do you handle drainage on sloped Farmingdale lots?
Yes, we grade and plan drainage around the slope before foundation work starts on any ADU.
Do I need new septic capacity for an ADU in Farmingdale?
It depends on your existing system's capacity. We check this early since it's a common gating factor.
How long does an ADU build take in Farmingdale?
Budget 2 to 4 months for permitting before groundbreaking, then add the build time your scope calls for.

Next step
Ready to talk about your Farmingdale ADU
Reach out. We'll walk the property with you and be straight about what fits and what it costs.